Construction » Elementary Schools

Elementary Schools


The Phase IX project work plans and documents for the elementary schools have been apporved by NYS Education department.  It is expected that these projects will go out for bid by March 2008 and for construction to begin in June 2008.

All elementary buildings will get infrastructure and energy saving improvements. In addition, the library at Neil Armstrong will be renovated to regain lost instruction space. Below is a listing of work to be done at each elementary school:

Neil Armstrong

  • Renovate Library
  • Repair Roof
  • Replace Windows
  • Replace Carpet
  • Remove Vinyl Asbestos Tile
  • Replace Folding Gym Partition
  • Replace Door Hardware - ADA
  • Add Handicapped Lift for Stage Platform
  • Reline Hot Water Tank
  • Install Backflow Preventers
  • Replace Electrical Panels
  • Replace folding wall
  • Upgrade Lighting
  • Replace Roof Top Units                          
  • Implement Hot Water Conservation         
  • Pave Parking Lot

                                               

Florence Brasser

  • Repair & Repoint Exterior Walls
  • Replace Windows
  • Replace Gym Windows
  • Replace Door Hardware - ADA
  • Add Handicapped Lift for Stage Platform
  • Repair Roof
  • Replace Vinyl Asbestos Tile & Carpet
  • Add Toilet Exhaust Fans
  • Replace Kitchen Hood Fan
  • Replace Electric Panels in Corridors
  • Replace Fire Alarm System
  • Upgrade Lighting
  • Replace Boiler                        
  • Implement Hot Water Conservation         
  • Pave Parking Lot

 

Walt Disney

  • Repair & Repoint Exterior Walls
  • Replace Door Hardware - ADA
  • Replace Gym Folding Partition
  • Reline Hot Water Storage Tank 
  • Replace Electric Panels
  • Make bathrooms handicapped accessible
  • Replace Parking Lot Lighting
  • Replace/upgrade Fire Alarm System
  • Replace Lighting     
  • Implement Hot Water Conservation         
  • Water Conservation
  • Pave Parking Lot

 

Washington Irving

  • Roof Repairs & Recoating
  • Repair & Repoint Exterior Walls
  • Add Handicapped Lift for Stage Platform
  • Replace Electric Panel
  • Replace Fire Alarm System
  • Replace Lighting                     
  • Replace Boiler
  • Implement Hot Water Conservation
  • Replace Steam System with Hot Water
  • Water Conservation

Paul Road

  • Abate Asbestos
  • Replace Vinyl Asbestos Tile & Carpet
  • Replace Toilet Partitions
  • Replace Door Hardware - ADA
  • Add 2nd Exit to Boiler Room
  • Reline Hot Water Storage Tank
  • Replace Exhaust Fan - Girls' Gym
  • Replace Exhaust Fan - Boys' Gym
  • Replace Exhaust Fan - Cafeteria
  • Replace Exhaust Fan - Stage
  • Replace Electrical Panels
  • Replace Parking Lot Lights
  • Upgrade Lighting
  • Replace Boiler        
  • Implement Hot Water Conservation         
  • Water Conservation